New from Strategos

Training in Lean Manufacturing & Strategy


lean article mnu leadout 
lean article mnu lead-in

Onsite SMED Kaizen Event

Seminar Highlights

 

Setup Reduction

Eliminating Adjustments

Videos of actual setups illustrate how to eliminate adjustments and make setups both faster and more consistent.

 

Team Setups & Changeovers

Indy 500 Pit Stop

Participants apply techniques to an actual pit stop to practice and learn.

 

Changeover on Printing Press

Into Practice

This participant is using his team's analysis on an actual setup of an eight-color printing press. The team reduced changeovers by 50% in their first effort.

 

 

Kaizen symbolSetup Reduction (SMED) Kaizen Event

Two Days to Faster Setups

This intensive two-day Setup-Reduction Kaizen Event (blitz) generates order-of-magnitude improvements in setup time and setup cost. The immediacy and urgency of this session changes paradigms, generates enthusiasm and brings rapid, low-cost solutions. 

Setup Reduction or SMED is the key to small batches, fast response, quality, and Kanban production control in many situations. 

Format Live Onsite Who Should Attend?
Time 2-Day

Setup Operators Production Operators Supervisors Engineers Schedulers Managers

Cost $5500 (Includes Travel)
Participants 5-16
Next Step Call us at 816-931-1414

36 Hours To Faster Setups

Kaizen Event Schedule

Videotape & Prepare-Strategos helps identify a setup and client videotapes it. Preparations are made and resources such as Maintenance, Engineering and Tool Room are reserved. Team members are assigned.

Train- Four hours of training prepares the teams with tools and techniques for analysis. Analyze- Teams analyze videotapes and plan improvements.

5-S- Teams execute 5-S techniques to clean, paint, arrange and organize the equipment and the area.

Modify, Repair & Build- Repairs and changes to equipment and tooling are made. Fixtures, racks and carts are built. Maintenance and Tool Room personnel may work into the night. 

Practice- Teams practice setups & videotape improvements.

Standardize- Some team members practice; others document the setup. 

Follow-Up- Some improvements must be left for later. These are documented. Your Strategos advisor continues support via phone and email.

Participants Will Learn...

  • About Five dramatic benefits from SMED.

  • A structured Four-Step process for streamlining changeovers.

  • Dozens of specific ideas to improve setups.

  • How to overcoming the deadly effect of poor housekeeping.

  • How to eliminate adjustments--the most time-consuming and frustrating part of setup.

Program Outline

1. The Importance of Setup Reduction

Optimum Lot Sizing

Consistency

2. The Four Phases

Organization, Maintenance & Housekeeping

Converting Internal Elements To External

Improving Elements

Eliminating Adjustments

3. Documenting Current Practice

Using Videotape

Process Charting

Multi-Task Charting

4. Improving The Setup

Specific Techniques for Various Industries

Brainstorming

Analyzing The Tapes & Charts

5. Implementing Your Program

Establishing Metrics

Setting Priorities

Training

■ ■ ■ ■ ■ ■ ■

Contact Webmaster

 

Strategos-International:  North America - Europe - Australia

Strategos Footer

SEP 2008 Rev:MAY 2011