New from Strategos

Training in Lean Manufacturing & Strategy


lean article mnu leadout 
lean article mnu lead-in

Onsite Kaizen Event—Workcell Design & Implemention

 

 

Kaizen Team

 

 

high production cell

 

 

assembly workcell

 

 

workcell layout

 

Workcell Design & Implementation

5-Day Kaizen Event Transforms Your Process

Kaizen logoIn this intense, five-day "event" one to three teams design and implement workcells in their respective areas. 

During the preparation of 2-4 weeks, a Strategos consultant works with your in-house facilitator to select areas or product lines, identify team members, collect information and provide necessary resources. 

During the Blitz week, teams learn the essentials of cell design, and design their own cells. They teams work long days to rearrange equipment, clean the area and reorganize. They then operate the new workcell and measure results. 

Format Live Onsite Who Should Attend?
Time 5-Day Managers
Industrial Engineers
Manufacturing Engineers
Facility Planners
Production Supervisors
Production Schedulers
Cost $9500 (Includes Travel)
Participants 5-30
Next Step Call us at 816-931-1414

Kaizen Schedule

Prepare

Strategos advisor and client's Facilitator determine area(s) for improvement. The original process is documented with videotape. The facilitator assembles data and information. Preparations are made and resources reserved. Team members are assigned. 

Train

Twelve hours of training prepares the teams.

Analyze

Teams analyze videotapes, data and design workcells. 

Modify, Repair & Build

Teams execute 5-S techniques to clean, paint, arrange and organize the equipment and the area.

Practice

Teams practice operations. Videotapes demonstrate the improvement and provide for future Kaizen.

Standardize

As some team members practice, others document the process and standardize operations. 

Celebrate

A celebration features presentations by the teams and closes the initial phase. 

Follow-Up

Improvements not feasible within the timeframe are documented for future implementation. Metrics are established. Strategos continues support via phone and email.


Participants Will Learn...

  • How Process Charts streamline workflow.

  • How to establish TAKT time, process time, and setup time.

  • How to determine the right number of people.

  • How to measure performance and use metrics.

  • About U-shape cells, other layouts and when to use each.

  • How to balance the work for equipment and people 

  • How to design a Kanban system for your cell.

  • 5-S and how to organize for productivity.

Program Outline

1. What Is Cellular Manufacturing? 

        Why Cells Are So Powerful 

        Cell Design Procedures 

2. Selecting The Products 

        Finding Part Families 

        Group Technology 

        Dedicated Vs. GT Cells 

3. Engineering The Process 

        Process Charting 

        Estimating Times 

        Calculating Cell Capacity 

        How Many People

        How Many Machines? 

 

4. Defining Infrastructure 

        Scheduling 

        Handling & Containers 

        Balancing The Work 

        Measuring Success(Metrics)

5. Layout of The Cell 

        Cell Configurations 

        Layout Procedures 

6. Organizing and Standardizing

        5-S Techniques

        Standard Process Sheets

■ ■ ■ ■ ■ ■ ■

Contact Webmaster

 

Strategos-International:  North America - Europe - Australia

Strategos Footer

SEP 2007     ©_Permissions