Clean, Polish & Paint
With only
essential items remaining, it is time to clean and paint. In some 5S programs, cleaning and
painting are considered separately. Either way, it is likely to be done over time.
The first cleaning leaves some dirt and oil. The next cleaning looks better and third
cleaning will prepare for painting. All floors, equipment, and almost every surface should get
paint.
|
|
At minimum, standardize the 5S activities and daily tasks. In some programs,
standardization is used as an opportunity to standardize normal work activities and develop work
instructions.
Standardize 5S Activities
-
Aisle Marking
-
Cleanliness Standards
-
Color Schemes
-
Cleaning Schedules
-
Signage
|
|
Institutionalize The Systems
Sustainment
is usually the most difficult part of 5S. The attitudes and activities must be institutionalized and repeated until the become part of the culture and the fabric of everyday work.
This cannot be outsourced or solved with software. Management, top management, must reinforce it constantly with time, attention and repetition.
|
|