| Clean, Polish & Paint
						 With only 
						essential items remaining, it is time to clean and paint. In some 5S programs, cleaning and 
						painting are considered separately. Either way, it is likely to be done over time. The first cleaning leaves some dirt and oil. The next cleaning looks better and third 
						cleaning will prepare for painting. All floors, equipment, and almost every surface should get 
						paint. |     | 
				
				
					
						| At minimum, standardize the 5S activities and daily tasks. In some programs, 
						standardization is used as an opportunity to standardize normal work activities and develop work 
						instructions.   Standardize 5S Activities
							
							Aisle Marking
							Cleanliness Standards
							Color Schemes
							Cleaning Schedules
							Signage |    | 
				
				
					
						| Institutionalize The SystemsSustainment
            is usually the most difficult part of 5S. The attitudes and activities must be institutionalized and repeated until the become part of the culture and the fabric of everyday work. 
            This cannot be outsourced or solved with software. Management, top management, must reinforce it constantly with time, attention and repetition.  |  |